The PECO Service and Meter Application form is a comprehensive document required for requesting electric services and meter installation or modifications from PECO. This form facilitates various requests, including new service connections, load increases or decreases, service reintroductions after a disconnection, temporary service setups, changes or upgrades to existing service, and requests related to demolition or construction activities. To ensure accurate and efficient processing, applicants must provide detailed information such as the customer's name, service and billing addresses, identification number, and specific details about the service request, including the type and characteristics of the service, meter information, heating and air conditioning details, and load characteristics. Additionally, the form requires details about the electrician or builder involved, construction status, and anticipated service commencement dates. It's important to include a signature and the date on the application to confirm the validity of the request. The instructions emphasize the importance of submitting a complete application to avoid delays and ensure compliance with PECO's Electric Service Requirements manual. Applicants are also reminded of the necessity of a credit application if the customer hasn't had PECO service in the last 60 days, and the possibility of request cancellation if no communication is received within 90 days of PECO's response. The instructions also highlight the need to contact PECO for information regarding service availability, meter location, and any required inspections by approved agencies.

Form Preview Example

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE "SAMPLE" FORM

A.After reading the instructions at the top of the application, locate the PECO regional office in which the service is requested. Check the appropriate box and mail or fax the completed application to the appropriate regional office.

B.Complete the fields for customer's name and service location. Customer's Driver's License Number or Social Security Number is now required.

Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.

(**) Use the address of the service when applying for underwriter's inspection.

C.Complete the fields for customer's PECO billing address or account number (within last 60 days).

D.Complete fields regarding you as the electrician or contractor, and indicate where you would like the reply sent. The Electrician/Builder Tax Identification number is now required. Also, please include the date you would like the reply returned to you.

E.Indicate your current construction status, and include the date PECO service is requested. Please avoid using "as soon as possible".

F. thru J. Indicate the following:

Type of Request

Type of Service (include number of units and area per unit)

Service Characteristics

Meter Information

Heating/Air Conditioning

K.Complete the table concerning the load characteristics of the service. For each applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW Demand, and 3) Maximum Winter KW Demand.

L.Complete the table concerning motor information.

M.If compensated metering will be used, indicate totalizer and general load (KW).

N.Include any additional comments.

O.

Application MUST be signed and dated.

Forms Rev. 5/18

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA

 

 

 

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

 

 

 

COUNTY

 

 

 

1050 W. Swedesford Rd.

COUNTIES

 

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

830 S. Schuylkill Ave.

Berwyn, PA 19312

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

 

 

 

 

Philadelphia, PA 19146

Email:DelChesterServiceApplications@ex

Warminster, PA 18974

 

 

 

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Email:PhilaNewBusiness@e

eloncorp.com

 

 

 

 

 

 

 

Email:Bucksmontserviceapplications@e

Warminster, PA

18974

 

 

 

 

 

 

 

 

 

xeloncorp.com

 

 

 

Fax # (610) 725-1416

 

 

 

 

xeloncorp.com

 

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

Fax # (215) 731-2327

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

 

 

 

 

 

 

 

 

Tax ID # or SSN

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Separation of Wiring

Service Relocation

 

 

 

Service)

 

 

 

 

 

 

** ADDRESS TO BE SERVED

 

 

B

 

 

 

 

 

APARTMENT/LOT #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CITY, STATE

 

 

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* If Applicable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

** Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

 

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

C

 

 

-OR-

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

 

3

 

 

120/240

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

3

 

 

120/208

 

 

 

4

 

 

 

 

CITY, STATE

 

 

ZIP CODE

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

 

 

 

3

 

 

277/480

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

 

 

 

3

 

 

13200

 

 

 

3 or 4

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

 

 

 

3

 

 

33000

 

 

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER INFO:

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

 

 

Multiple Meter Total No. _____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

 

 

 

 

 

 

 

 

 

Reply Requested by:

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

/

/

 

 

 

Central Air _____ Tons

 

Resistance

 

 

 

J

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

City, State

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPE

 

LOAD (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

E-MAIL ADDRESS

 

 

 

 

 

SUMMER (kW)

 

 

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____

In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCRIPTIN OF WORK

 

 

N

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

DATA RECEIVED

DESIGNER

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

T

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NUMBER

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER ____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-

 

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Demand)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load

 

 

 

 

 

 

estimates for the first year of service. The customer’s Procurement Class will be adjusted each year,

 

 

 

 

 

 

based on actual usage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

CTs-

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________

 

 

Taps Only

 

 

See Job # ________________________________

 

Indoo

Outdoor

 

On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above

 

 

 

 

 

 

 

 

 

 

r

 

 

 

 

 

Ground

 

 

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

Underwriter’s Cert.

 

Yes

No

 

 

 

 

 

 

 

 

 

Advance Billing

Yes

 

$_______________

Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Required

 

 

 

__

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer

 

 

Permit Required

 

Yes

No

State

Other

 

 

 

 

 

 

 

Charges:

$_______________

 

 

 

 

 

 

 

 

 

 

 

__

 

 

 

 

 

 

 

 

_______________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cust. #

 

 

Date

 

 

ACT 222 Cert. Required

 

Yes #

 

 

No

N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_________________________

 

___________________________

 

 

 

_____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BTCO #

 

 

Date

 

 

PA One Call #

 

 

 

 

 

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

___________________________

 

 

 

 

__________________________

 

 

 

 

 

 

 

CATV #

 

 

Date

 

 

Gas

BTCO

CATV

Other

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

 

 

 

 

 

___________________

__________________________

 

 

 

 

 

 

 

 

Other

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

__________________________

 

___________________________

SKETCH / INSTRUCTIONS

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA COUNTY

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

830 S. Schuylkill Ave.

1050 W. Swedesford Rd.

 

COUNTIES

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

Philadelphia, PA 19146

Berwyn, PA 19312

 

400 Park Ave.

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

Email:PhilaNewBusiness@ex

Email:DelChesterServiceApplications@exe

Warminster, PA 18974

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

eloncorp.com

 

 

loncorp.com

 

 

 

Email:Bucksmontserviceapplications@e

 

Warminster, PA 18974

 

 

 

Fax # (215) 731-2327

Fax # (610) 725-1416

 

xeloncorp.com

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

Tax ID # or SSN

 

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

** ADDRESS TO BE SERVED

 

 

APARTMENT/LOT #

 

 

 

Separation of Wiring

Service Relocation

 

 

Service)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

 

 

 

 

 

 

 

 

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*

If Applicable

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

**

Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

3

 

 

 

 

 

 

 

-OR-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

3

 

 

120/240

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

3

 

 

120/208

 

4

 

 

CITY, STATE

 

ZIP CODE

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

3

 

 

277/480

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

3

 

 

13200

 

3 or 4

 

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

3

 

 

33000

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

METER INFO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

Multiple Meter Total No. _____________

ADDRESS

 

 

 

 

Reply Requested by:

 

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

/

 

 

Central Air _____ Tons

 

Resistance

 

 

 

 

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

TELE. #

 

 

 

 

E-MAIL ADDRESS #

 

 

 

 

 

TYPE

 

LOAD (kW)

 

SUMMER (kW)

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____  In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCIPTION OF WORK:

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

 

DATA RECEIVED

DESIGNER

 

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

 

T NUMBER

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

 

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-Demand)

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for

 

 

 

 

 

 

 

 

 

 

the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage.

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

 

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

 

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

 

CTs- ________

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

Indoor Outdoor

On ________

Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground

Taps Only

 

 

See Job # _________________________________

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

 

 

 

 

Underwriter’s Cert. Required

 

Yes

No

 

 

 

 

 

 

 

Advance Billing Required Yes

 

 

$_________________

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer Charges: $_________________

Permit Required

 

 

 

Yes

No

State

Other _______________________

Cust. # _________________________

Date ___________________________

ACT 222 Cert. Required

 

Yes # _____________

No

N/A

 

 

 

 

BTCO # ________________________

Date ___________________________

PA One Call # ___________________________

 

 

Date __________________________

CATV # ________________________

Date ___________________________

Gas

BTCO

CATV

Other ___________________

Date __________________________

Other __________________________

Date ___________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SKETCH / INSTRUCTIONS

File Characteristics

Fact Name Fact Detail
Service Application Overview This form is used to apply for new electric service, modifications to existing service, or removal of service. It's essential for residential or commercial construction projects requiring electric service from PECO.
Required Information Applicants need to provide personal identification (e.g., Driver's License Number or Social Security Number), detailed project information, and specific electric service requirements. This includes the type of service, anticipated construction dates, meter information, and load characteristics.
Submission Process The completed form should be submitted to the PECO Regional Office that serves the area where the service is requested. Incomplete applications may lead to delays, emphasizing the importance of providing detailed and accurate information.
Compliance and Approvals All work must adhere to PECO Electric Service Requirements. Additionally, the installation must be inspected by an approved inspection agency, a step that is particularly highlighted for requests within the City of Philadelphia, which may involve coordination with Licenses & Inspections.

Steps to Writing Peco Service And Meter Application

Filling out the PECO Service And Meter Application form is essential for setting up electric service at your location. This process ensures your electric service setup is handled efficiently and according to your needs. Follow these steps to complete the form accurately.

  1. Before starting, read the instructions at the top of the application form carefully.
  2. Identify the PECO regional office for your service area. Check the box corresponding to this office and prepare to mail or fax your application there.
  3. Fill in the customer's name and the service location in the fields provided. You must include either the Customer's Driver's License Number or Social Security Number.
  4. If applicable, include the PECO Energy pole number and/or Lot number.
  5. For underwriter's inspection, use the service address.
  6. Enter the customer's PECO billing address or provide the account number if the customer has had PECO service in the last 60 days.
  7. Provide information about yourself as the electrician or contractor, including your Tax Identification number and the address where you would like the reply sent. Specify the date by which you expect a response.
  8. Detail your current construction status and include the date when PECO service is requested.
  9. Select the type of request, type of service, service characteristics, meter information, and if applicable, heating/air conditioning details.
  10. Complete the table with information about load characteristics, including connected KW, maximum summer KW demand, and maximum winter KW demand for each type of load.
  11. Fill in the motor information table.
  12. If compensated metering is applicable, indicate the totalizer and general load (KW).
  13. Add any additional comments that may be relevant to your application.
  14. Ensure the application is signed and dated before submission.
  15. Check if you need to include any enclosures, such as site plans or single line diagrams, and attach them accordingly.

After completing these steps, review your application to ensure all information is correct. Once verified, submit your application to the regional office you identified in step 2, using the provided mailing or fax information. This thorough approach helps to avoid delays and ensures your electric service needs are met efficiently.

Important Details about Peco Service And Meter Application

Who needs to complete the PECO Service and Meter Application form?

The PECO Service and Meter Application form must be completed by anyone requesting a new service, a load increase or decrease, reintroduction of service, temporary service, service upgrade or changes, or demolition which involves removing electric or gas facilities. This includes homeowners, builders, contractors, and electricians planning to initiate or modify electric service.

What information is required on the application?

The application requires several pieces of critical information including the customer's name and service location, billing address or PECO account number, electrician or builder's details including tax identification number, current construction status, type of request (e.g., new service, load increase), type of service, service and meter characteristics, load characteristics, motor information if applicable, and any additional comments. A signature and date by the applicant are also mandatory for the application to be processed.

How can I submit the application and what happens after submission?

The application can be submitted by mail or fax to the PECO regional office responsible for the service area where the new or modified service is requested. After submission, the application will be reviewed for completeness and compliance with PECO Electric Service Requirements. Incomplete information may delay processing. The company will communicate its response, which may include a service request number and further instructions or request for additional information. It's important to note that PECO may cancel the request if no further communication is received within 90 days of their response.

Is a credit application required?

Yes, a credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. This step is crucial to establishing creditworthiness and ensuring timely initiation of service.

What should I do if I need to demolish a building and require PECO to remove electric or gas facilities?

If demolishing a building and electric or gas facilities need to be removed, it's essential to call 8-1-1 (PA ONE CALL) for a demolition request. This will help in coordinating the safe removal of such services.

How is the service type and phase determined?

The type of service (residential, commercial, industrial, etc.) and the service phasing (single phase, two phase, or three phase) are determined based on the initial construction plans and estimated peak load requirements submitted with the application. PECO will advise on the availability of service types and voltages in the area, and the company may adjust the customer's procurement class annually based on actual usage. The meter location and requirements, including advance notifications and customer billing, will also be defined through this process.

Common mistakes

Filling out the PECO Service and Meter Application form is an integral step for obtaining necessary utilities for residential or commercial properties. However, this task often comes with pitfalls that can lead to delays or complications in service provisioning. The following elucidates five common mistakes people make during this process.

A significant error is when applicants fail to accurately select the type of service request. With options ranging from new service installations to service upgrades or relocations, the choice dictates the processing pathway of the application. Misclassification can result in improper handling, causing avoidable setbacks.

Another oversight is the incomplete or incorrect provision of the location information where the service is required. Particularly, the requirement to include a utility pole number or lot number, when applicable, is often missed. This specific detail is crucial for PECO to locate the site efficiently, especially in areas where addresses might not provide sufficient clarity.

The application also requires the electrician or contractor's Tax Identification Number and specific reply details, areas frequently overlooked. This information is vital to ensure that communication regarding the application flows smoothly and reaches the correct parties in a timely manner. Without it, there is a risk of delays in processing or miscommunication.

Inadequately detailing the characteristics of new or additional load can also lead to challenges. This section helps PECO understand the demand that will be placed on their network, influencing decisions on infrastructure needs. Failing to provide complete details or underestimating the load can lead to insufficient service provision, which may require future, costly corrections.

Lastly, a common mistake is not including the necessary enclosures, such as site plans or diagrams, with the application. These documents are essential for PECO to assess the project comprehensively. Lack of this accompanying information might not only delay the application process but can also lead to incorrect service installation, which could have been avoided with a complete initial submission.

In summary, attentiveness to the type of service requested, accurate location details, proper identification and communication information for contractors, precise load characteristics, and the inclusion of necessary enclosures are paramount for a smooth PECO Service and Meter Application process. Avoiding these mistakes can significantly expedite service setup and mitigate any unnecessary complications.

Documents used along the form

When submitting the PECO Service And Meter Application form, various other forms and documents are typically required to ensure a comprehensive and compliant submission. These additional forms play a crucial role in providing detailed information about the project, the site, and specific requirements or limitations that may affect service delivery. Understanding these documents can simplify the application process.

  1. Site Plans: Detailed drawings showing the layout of the property, including locations for electrical services, meters, and relevant infrastructure.
  2. Single Line Diagrams: A simplified notation that represents the distribution of electrical power in the project. It helps in planning the electrical system layout.
  3. Substation Arrangement Documents: For projects requiring high power loads, these documents detail the setup and specifications of any needed substations.
  4. Credit Application and Agreement: This form is necessary if the customer has not had PECO service in the past 60 days. It assesses creditworthiness for billing purposes.
  5. Underwriter's Certification: A document stating that the electrical installations meet approved standards. It's often required to commence service.
  6. ACT 222 Certification: Required for specific projects, indicating compliance with certain regulatory standards or conditions.
  7. PA One Call Verification: Confirms that the necessary call to 811 has been made to ensure no underground utilities are disturbed during construction.
  8. Customer Permit Documentation: Permits from the city or local municipality may be needed for electrical work or for certain types of constructions and installations.
  9. Demolition Request Forms: If the project involves demolition, a form indicating coordination with PECO for the removal of existing services or meters is required.

It's important for applicants to gather and complete these forms accurately to avoid any delays in the process. Each document provides critical information that supports the main application, ensuring that electrical services can be provided safely, efficiently, and in compliance with local regulations. For those unsure about the requirements, it's recommended to consult with an experienced electrician or contractor who is familiar with the process.

Similar forms

The PECO Service and Meter Application form shares similarities with a Utility Service Application for new residential constructions. Both applications require detailed information about the project location, type of service requested (e.g., electrical, gas), and customer contact details. They also need technical specifics about the service requirements, such as phase, volts, and wires, ensuring the utility company can provide adequate service to meet the construction's demands.

Another document resembling the PECO form is the Building Permit Application. This similarity lies in the necessity to detail the construction status, provide project descriptions, and include diagrams if necessary. Both forms serve as a preliminary step to ensure all construction complies with local regulations and utility company requirements before work begins.

An Electrical Inspection Certificate is also akin to the PECO application, particularly where the form requires using the service address for an underwriter's inspection. This underscores the importance of safety and compliance with electrical standards, ensuring the installation meets specific guidelines before service can be initiated or continued.

The Contractor's License Registration form resembles the section of the PECO application that collects information about the electrician or builder responsible for the construction. Both documents require the contractor’s details, including name, address, and identification numbers, to verify the legitimacy and qualifications of the professionals undertaking the project.

A Site Plan Submission is another document with significant parallels. Both the site plan and the PECO application require detailed descriptions of the site, including its layout, the location of utilities, and any specific characteristics pertinent to the service installation. This information helps in planning and executing the necessary infrastructure to support the service.

The Customer Credit Application component of the PECO form has counterparts in many service-related applications where a new customer relationship is being established. It's essential for assessing the creditworthiness of the applicant to ensure they can fulfill financial obligations associated with the service provided, mirroring procedures in telecom or other utility services.

A Demolition Request form also has similarities, especially in cases where the PECO application involves removing electrical or gas facilities due to demolition. Both forms involve notifying utility companies and obtaining clearance before proceeding with demolition, highlighting the importance of safety and coordination with service providers.

Lastly, a Zoning Compliance Certificate resonates with aspects of the PECO application that require acknowledgment of local zoning laws and regulations. Just as zoning compliance ensures that construction aligns with municipal guidelines, the PECO application ensures that service requests comply with utility regulations and capacities.

Dos and Don'ts

When you're filling out the PECO Service And Meter Application form, there are critical steps you should follow to ensure the process goes smoothly. Below, find lists of things you should and shouldn't do.

What You Should Do:

  1. Read the instructions at the top of the application carefully to understand the form requirements and locate the PECO regional office for your service request.

  2. Fill out all required fields including your name, service location, PECO billing address or account number, electrician or contractor information, and the type of service and characteristics requested.

  3. Include your Tax Identification Number or Social Security Number as now required for customer identification purposes.

  4. Indicate your current construction status accurately, including the date service is requested, to avoid any potential delays in service initiation.

  5. Sign and date the application. An unsigned form may not be processed.

What You Shouldn't Do:

  • Do not leave any required fields blank. Incomplete information can result in delays in processing your application.

  • Avoid using vague terms like "as soon as possible" for the service requested date. Be specific to ensure timely processing.

  • Do not forget to include additional documentation, such as site plans or single line diagrams, if applicable to your request.

  • Do not send the application to the wrong PECO regional office. Always double-check the appropriate office based on your service location.

  • Resist the urge to guess or estimate information about load characteristics or other technical details. Ensure accuracy by consulting with a professional if necessary.

Misconceptions

When working with the PECO Service And Meter Application form, it's easy to stumble upon misconceptions that can complicate the process. Let's tackle some common misunderstandings:

  • Every section must be filled out by the customer: Not all sections of the form apply to every applicant. Some fields are relevant only for specific types of service or customer situations. It's important to read instructions carefully to determine which parts you need to complete based on your circumstances.
  • Personal identification numbers are optional: It's a requirement to include a Tax ID number or Social Security number. This information is essential for processing your application and establishing your account.
  • You can use the form immediately for any type of request: While the form accommodates various service requests, including new connections and modifications, each request type has specific instructions and requirements. Ensure your application aligns with your exact service need.
  • PECO decides the service location: The applicant must provide a detailed service location, including a site plan if necessary. This information is crucial for PECO to understand where to establish or modify the service.
  • Service and meter details should be based on current needs only: When filling out the form, consider both your current and future electricity needs. Forecasting helps ensure your service is adequate over time, preventing unnecessary adjustments later.
  • Submission methods are limited: You can return the completed form to PECO through various channels, including mail or fax. Choose the method that is most convenient for you, ensuring it reaches the regional office associated with your service area.
  • Demolition requests are unrelated: If you're demolishing a building and need PECO to remove electric or gas facilities, this form mentions the necessity of contacting PA One Call. It’s a critical step, separate from the typical service and meter requests.

Understanding these points can simplify the application process, making it smoother to initiate or modify your electrical service with PECO. Remember, each section of the form connects to specific requirements and instructions aimed at ensuring that you receive the correct service based on your individual or business needs.

Key takeaways

When filing the PECO Service And Meter Application form, it's important to carefully follow the outlined instructions to ensure efficient processing. Here are key takeaways to guide you through the process:

  • Identify the correct PECO regional office for your service request based on the service location, and submit the completed application to that office either by mail or fax.
  • Provide accurate information regarding the customer's name, service location, and contact details, including either a Driver's License Number or Social Security Number, as these are necessary for the application process.
  • For customers who have had PECO service within the last 60 days, their billing address or account number is required. If there's been no service within that timeframe, a new credit application and agreement must be completed.
  • Electricians or contractors must fill in their details, including Tax Identification Number, and specify the preferred return date for the application reply.
  • Clearly state the type of request, such as new service, load increase or decrease, service reintroduction, temporary service, upgrade or changes, and demolition among others. Accompany these details with an accurate description of the type and characteristics of the service being requested.
  • Include information about the construction site, like the current status of the construction, expected date of PECO service commencement, and detailed load characteristics (connected KW, maximum summer and winter KW demand) and motor information if applicable.
  • Ensure all required documents such as site plans, single line diagrams, substation arrangement, and any additional comments that could help in processing the application, are attached.
  • The application must be signed and dated before submission. Incomplete applications may result in processing delays, and PECO reserves the right to cancel requests with no further communication from the customer within 90 days of their response.

Remember, before purchasing electrical equipment or proceeding with any wiring, you should verify service availability and meter location with PECO. Compliance with the PECO Electric Service Requirements manual and approval from an inspection agency are mandatory for all work. It's also advisable to call PA One Call for demolition requests and to check service voltages since not all voltages are available in all areas.